P2
P3
P14
Some manual calculations are presented here as pile cap design examples.  Click on the icon for the example you wish to review and it will open in your browser. Click on the caps below to download a pdf file to your computer.
Copyright 2009 by S.E. Software.  All rights reserved
hr
hr
S.E. Software


Below are screenshot movies that show program operation and capabilities.  Click to play.  Double click on the player once the movie has started to make full-screen.
The true power of this software is the analysis of as-installed piles and the design of a fix when the resulting group of piles results in an overload.

Start by creating a base pilecap.  The movie at left shows how easy this is.
Now move the piles to correspond to their as-installed postions.  There are several ways to do this.  Piles can be moved individually by clicking on them and entering either coordinates or deviations from design locations.  Or, use the Move Table to enter deviations for all piles at the same time.  The movie at left shows how easy this is done.
Since piles are overloaded, the group must be fixed.  Add piles to the cap and analyze the resulting group.  The movie at left shows how this is done.

Note:  This movie demonstrates features that available in the Professional version only.